OEG-CML-001 · NOT_ESTABLISHED

Independent third-party validation of the reported 800VDC / SST deployment is established.

One operator-reported deployment at one named campus; no independent performance validation is established.

Case
CML-PDRE-001 · 800V DC Data Center Power Architecture
Claim
CML-PDRE-001.INDEPENDENT_VALIDATION
Current state
NOT_ESTABLISHED
Evidence cut-off
2026-09-20T10:46:47Z
Last reviewed
2026-10-05

What is established

  • One named operator reported commercial operation of a materially relevant 10kV AC to SST to 800VDC architecture.

What is not established

  • Independent verification of operating conditions, performance, availability, efficiency, or safety at the named site.

What would change this

An independently attributable operating or test record tied to the named site, with observation period, conditions, method, and responsible organization.

Qualifying boundary

Examples that may qualify

  • Independent engineering test report
  • Operator record with attributable methodology
  • Third-party commissioning or performance record

Examples that do not qualify

  • Vendor marketing copy
  • Unattributed screenshots
  • A second retelling of the operator's original announcement

Challenge this gap

Append-only

Public change log

Accepted evidence may result in a state change, no state change, or scope clarification. Earlier entries remain visible.