{"gap":{"gap_id":"OEG-CML-001","case_id":"CML-PDRE-001","case_title":"800V DC Data Center Power Architecture","case_url":"https://structurevidence.org/cases/800vdc/","claim_id":"CML-PDRE-001.INDEPENDENT_VALIDATION","claim_text":"Independent third-party validation of the reported 800VDC / SST deployment is established.","current_state":"NOT_ESTABLISHED","current_scope":"One operator-reported deployment at one named campus; no independent performance validation is established.","evidence_cutoff":"2026-09-20T10:46:47Z","what_is_established":["One named operator reported commercial operation of a materially relevant 10kV AC to SST to 800VDC architecture."],"what_is_not_established":["Independent verification of operating conditions, performance, availability, efficiency, or safety at the named site."],"what_would_change_this":"An independently attributable operating or test record tied to the named site, with observation period, conditions, method, and responsible organization.","acceptable_source_examples":["Independent engineering test report","Operator record with attributable methodology","Third-party commissioning or performance record"],"non_qualifying_examples":["Vendor marketing copy","Unattributed screenshots","A second retelling of the operator's original announcement"],"last_reviewed":"2026-10-05","challenge_url":"https://structevidence.com/gaps/OEG-CML-001/"},"change_log":[{"change_id":"OEG-CHANGE-001","gap_id":"OEG-CML-001","challenge_id":null,"change_type":"GAP_OPENED","summary":"Initial open evidence gap published under Open Evidence Gap Protocol v0.1.","attribution":"StructEvidence","previous_state":null,"new_state":"NOT_ESTABLISHED","changed_at":"2026-10-05","append_only":true}],"no_auto_state_change":true}